New school wide air conditioning, technology infrastructure, fire
alarm, and electrical system upgrades and interior modifications
including:
-
Design and installation of a new central plant
including a dual chiller/pump system and a new electrical substation that
services 4 primary campus buildings – Administration Building, Classroom
Annex, Auditorium and Cafeteria
-
Design and installation of a new campus-wide fire alarm
system, technology backbone distribution, new site utility infrastructure
and utility distribution for 40 buildings constructed between 1935 and
1968 with integration of systems into historical interiors.
|
|
|